DISASTER PREVENTION AND MITIGATION PROGRAM
Approved Budget: P 14,620,000.00
Project Objectives:
- To reduce the vulnerability and exposure of communities to all hazards thru resettlement and relocation of families and schools to safer areas.
- To capacitate PDRRMC member agencies, LDRRMOs, and other stakeholders for effective DRR plan and programs.
- To strictly comply with the existing national and local laws an environmental protection/preservation, building code, land use planning, ECC, etc.
- To implement reforestation projects/activities ensuring the preservation and restoration of forest covers and watershed areas.
- To prevent flash floods and extreme flooding to communities and agricultural areas.
- To mitigate the possible effects of El Niño in priority areas.
Completed Projects:
A. Rechanneling, dredging and de-clogging of rivers in priority areas.
A.1. Rivers rechanneled
SAMARICA : 2 river-channeling
SABLAYAN : 2 brass damming
MAPSA : 5 brass damming
B. Rehabilitation/improvement of water supply system
B.1. Procured 200pcs of Jetmatic and 2 water pumps-distributed to priority areas
C. Advocacy on the strict implementation of “No Build Zone” law
C.1. Distributed 4,800 pcs.:
Flood : 1,200 pcs. distributed (300 per quarter)
Tsunami/Storm Surge : 1,200 pcs. distributed (300 per quarter)
Earthquake : 1,200 pcs. distributed (300 per quarter)
Landslide : 1,200 pcs. distributed (300 per quarter)
D. Vulnerability analysis and risk assessment conducted quarterly with the MDRRMOd and PDRRMC members
D.1. Conducted PDRRMC Quarterly Meeting
1st Quarter PDRRMC Meeting (March 19, 2021)
2nd Quarter PDRRMC Meeting (June 24, 2021)
3rd Quarter PDRRMC Meeting (September 16, 2021)
4th Quarter PDRRMC Meeting (December 15, 2021)
E. Community based and scientific DRRM and CCA assessment, mapping, analysis, and monitoring at the municipal and barangay conducted in priority areas.
E.1 Conducted Evacuation Center Assessment
MAPSA : completed
E.2 Conducted Contingency Planning
SAMARICA : 11 Island barangays completed
SABLAYAN : 9 barangays completed
On-going Projects:
F. Installation of solar lights to disaster and accident-prone areas communities
F.1 Procured 320 sets of solar lights with GI Pipe (for installation)
SAMARICA : 130 sets for installation
SABLAYAN : 37 sets for installation
MAPSA : 100 sets for installation
LOOC/LUBANG : 53 sets for installation
G. Improvement, re-gravelling of roads in priority areas
G.1 Roads re-graveled
SAMARICA : 9 roads re-gravelled/scraped/leveled/compacted/hauling of gravel and sand/site development/clearing
SABLAYAN : 17 roads re-gravelled/scraped/leveled/compacted/hauling of gravel and sand/site development/clearing
MAPSA : 23 roads re-gravelled/scraped/leveled/compacted/hauling of gravel and sand/site development/clearing
DISASTER PREPAREDNESS PROGRAM
Approved Budget: P47,313,130.00
Project Objectives:
- To develop a comprehensive emergency management system supported by policies, guidelines and procedures that will encompass all types of hazards.
- To enhance and strengthen the knowledge and skills of communities, volunteers, partners and stakeholders through continuous capacity building and information dissemination.
- To increase the level of awareness of communities to the threats and impacts of all hazards, risks, and vulnerabilities.
- To establish needed facilities such as evacuation centers and operation centers equipped with sufficient materials, tools, equipment, supplies and manned by well- trained camp managers and volunteers.
- To ensure that evacuation routes, disaster signages, and early warning systems are always in place.
- To ensure the presence of contingency plans in any type of disaster.
- To organize Barangay Disaster Volunteers who shall act as frontliners in disaster response.
- To ensure the availability and sustainability of logistics, funds, and other resources in times of emergency or disaster.
List of Completed Projects:
A. Trainings/meetings/assessment/planning
A.1 Conducted Basic Life Support and First Aid (BLS-SFA) Training
SAMARICA : 6 trainings
SABLAYAN : 16 trainings
MAPSA : 3 trainings
A.2 Conducted Basic Life Support and First Aid (BLS) Trainers’ Orientation
A.3 Conducted Awarding of Certificates and Orientation to Provincial Disaster Volunteers
SAMARICA : 147 volunteers
SABLAYAN : 717 volunteers
MAPSA : 153 volunteers
A.4 Conducted basic Incident Command System Orientation to PDRRMO staff
A.5 Conducted Radio Orientation with KABALIKAT Charity and KABALIKAT Civicom to PDRRMO SAMARICA and Provincial Disaster Volunteers
A.6 Conducted 2-day Assessment and Planning Workshop to PDRRM staff on March 4-5, 2021
A.7 Conducted DRRM Training on May 25, 2021
A.8 Conducted Contingency Planning Orientation to PDRRMC Member on May 31, 2021
A.9 Conducted Public Service Continuity Plan (PSCP) Training to office representatives of PGOM employees
A.10 Conducted Rubber Boat Operation and Maintenance Training to flash-flood prone areas
A.11 Conducted Water Search and Rescue (WASAR) Training to ARESCOM on October 10, 2021
A.12 Conducted Quarterly Nationwide Simultaneous Earthquake Drills (NSED) to PGOM employees at Capitol compound and in Sub-offices
1st Quarter NSED (March 11, 2021)
2nd Quarter NSED (June 10, 2021)
3rd Quarter NSED (September 1, 2021) 4th Quarter NSED (November 11. 2021)
A.13 Conducted Coordination Meeting
SAMARICA : 6 meetings
SABLAYAN : 16 meetings
MAPSA : 3 meetings
A.14 Conducted PDRRMC Quarterly Meeting
1st Quarter PDRRMC Meeting (March 19, 2021)
2nd Quarter PDRRMC Meeting (June 24, 2021)
3rd Quarter PDRRMC Meeting (September 16, 2021) 4th Quarter PDRRMC Meeting (December 15, 2021)
A.15 Conducted Staff Meeting
PDRRMO SAMARICA
PDRRMO Sablayan
PDRRMO Main Office
PDRRMO Looc
PDRRMO Lubang
PDRRMO Driver’s Assessment Meeting
A.16 Conducted LDRRMO Meeting with MDRRMOs
A.17 Attended/Facilitated IATF Meetings